Job at a Glance
- Company
- BC Hydro
- Location
- Burnaby, British Columbia (Edmonds A03)
- Salary
- $109,700–$138,700 per year
- Job type
- Permanent, full-time (37.5 hours per week), Hybrid
- Posted
- November 27, 2026
BC Hydro is hiring for its Transmission Planning team in Burnaby, British Columbia, with two permanent full-time openings on a hybrid schedule. You will plan how electricity moves across the province’s transmission network, studying system needs and shaping long-term upgrades. The posting lists the salary at $109,700 to $138,700 a year, with applications closing on 17 December 2026. The role is based at Edmonds A03 in Burnaby, working 37.5 hours a week. The duties, requirements and benefits below come from the employer’s live posting, checked on 28 November 2026.
Job at a Glance
| Company | BC Hydro | Location | Burnaby, British Columbia (Edmonds A03) |
| Salary | $109,700–$138,700 per year | Job type | Permanent, full-time (37.5 hours per week), Hybrid |
| Posted | 6 November 2026 |
Job Overview
The Transmission Planning team plans how electricity moves across British Columbia’s transmission network. The posting describes the work as studying system needs and shaping long-term upgrades — the team looks at what the transmission system needs now and in the years ahead, and plans the upgrades that keep power moving across the province. This is planning work, not field construction: the engineer studies the network, weighs what it will need, and shapes the long-term plan for it. The team is based at Edmonds A03 in Burnaby, and the role is hybrid, so part of the week is worked away from the office.
There are two openings, both permanent and full-time at 37.5 hours a week. The posting was published on 6 November 2026 and closes on 17 December 2026. The posting is described as evergreen, and the note on it says the page lists the closing date as the 30th of each month while the posting stays open — the 17 December 2026 date shown here is the closing date on the posting as opened on 28 November 2026, so applicants should treat that as the date to work to and check the live posting for any change.
About BC Hydro
BC Hydro is the employer behind this posting, hiring for its Transmission Planning team in Burnaby. The team’s work covers the province’s transmission network — the high-voltage lines and stations that move electricity across British Columbia. The posting places the role at Edmonds A03 in Burnaby on a hybrid schedule. The detail in this article comes from the posting itself, which was verified live on 28 November 2026.
BC Hydro — the British Columbia Hydro and Power Authority — is a provincial Crown corporation owned by the Government of British Columbia and regulated by the British Columbia Utilities Commission. It was created in 1961, when the BC Electric Company and the BC Power Commission were brought together under the BC Hydro Act. It is the main electricity distributor in the province, serving more than four million customers in most areas of British Columbia.
The company operates 32 hydroelectric facilities and two natural gas-fuelled thermal power plants, with a nameplate capacity of 12,049 megawatts. Its facilities generate between 43,000 and 54,000 gigawatt hours of electricity a year, depending on water levels, and most of the province’s electricity comes from hydroelectric stations on the Columbia and Peace rivers. That scale is the backdrop to this role: the Transmission Planning team plans the network that carries that power across the province.
Key Responsibilities
BC Hydro Transmission Planning has an exciting opportunity for experienced power system engineers to join teams responsible for planning and developing BC Hydro’s transmission system. Successful candidates will support transmission planning assessments to ensure the reliable, safe, and economic operation of the bulk electric system. This evergreen posting supports recruitment across multiple Transmission Asset Planning teams through a single hiring process. Successful candidates may be assigned to regional transmission planning, bulk transmission planning or operational planning teams based on business needs.
- Perform power system studies including power flow, short circuit, voltage stability, transient stability, dynamic performance, model validation, and disturbance assessments.
- Conduct near-term and long-term transmission planning studies and Mandatory Reliability Standard (MRS) reliability assessments.
- Assess load, generation, transmission service, and customer interconnection requests and develop transmission solutions.
- Develop and evaluate transmission reinforcement alternatives to address thermal, voltage, stability, transfer capability, and reliability limitations.
- Support operational planning studies, Remedial Action Schemes (RAS), and system operating strategies.
- Prepare technical reports, business cases, investment justifications, and planning recommendations.
- Develop and maintain planning models using tools such as PSS/E, PSLF, DSATools, ASPEN, or equivalent.
- Collaborate with internal stakeholders, customers, consultants, neighboring utilities, regulators, NERC, and WECC.
- Provide technical leadership for transmission capital projects and strategic initiatives.
- Represent BC Hydro on technical working groups and industry committees.
Requirements and Skills
The posting lists what it asks for as follows.
- Bachelor’s degree or higher in Electrical Engineering recognized in Canada.
- Registered, or eligible for immediate registration, as a Professional Engineer (P.Eng.) with EGBC.
- Engineer 1: EIT or eligible for EGBC registration.
- Engineer 2: Four or more years of relevant power system engineering experience. Registered as a Professional Engineer (P.Eng.) with Engineers and Geoscientists BC (EGBC), or eligible for registration through interprovincial transfer.
- Senior Engineer: Eight or more years of relevant power system engineering experience. Registered as a Professional Engineer (P.Eng.) with Engineers and Geoscientists BC (EGBC), or eligible for registration through interprovincial transfer.
- Demonstrated experience in transmission planning and power system analysis.
- Knowledge of NERC Reliability Standards, WECC planning criteria, and utility planning practices is an asset.
- Strong technical writing, communication, and stakeholder engagement skills.
- Preference will be given to candidates with strong academic background on power system, expertise in planning and operation of transmission systems, and knowledge of power utility business, transmission services and public utility regulation.
What else you should know
- This posting is for a Full Time Regular position.
- Please note the posted salary represents the base salary range for a Senior Engineer.
- A condition of employment for this job is that you maintain the following: Engineers & GeoScientists BC (EGBC) = In Good Standing.
- Internationally trained engineers may be considered if eligible for EGBC registration.
- Hybrid roles require in-office attendance 3 days/week.
- This role has been assessed as safety sensitive and pre-qualification alcohol and drug testing will be required as a pre-condition to employment.
Pay and Benefits
The posting states a salary of $109,700 to $138,700 a year. The range spans $29,000 from the low end to the high end, so where an applicant lands in it will depend on the factors BC Hydro applies when it sets pay — the posting does not say what those factors are, and this article does not guess. The role is permanent and full-time at 37.5 hours a week, so the salary is an annual figure for that schedule. The posting’s “What we offer” section lists a comprehensive benefits package, a minimum of 15 paid vacation days, a lifetime pension, a flexible work model depending on the role type, and training and development courses. The posting was published on 6 November 2026 and closes on 17 December 2026, and the salary stated above is the figure on the posting itself.
Who Should Apply
This role fits an engineer who plans transmission systems — someone who can study what a transmission network needs and shape long-term upgrades for it. The posting asks for a bachelor’s degree or higher in electrical engineering recognised in Canada, and registration, or eligibility for immediate registration, as a Professional Engineer (P.Eng.) with Engineers and Geoscientists BC. Engineer 1 needs EIT status or eligibility for EGBC registration, Engineer 2 needs four or more years of relevant power system engineering experience, and Senior Engineer needs eight or more years. Demonstrated experience in transmission planning and power system analysis is required, and knowledge of NERC Reliability Standards, WECC planning criteria and utility planning practices is an asset. The role is based at Edmonds A03 in Burnaby on a hybrid schedule, with two permanent full-time openings.
How to Apply
- Open BC Hydro’s official careers page using the link below and read the full posting, including the stated requirements and the closing date.
- Check that you can meet the 17 December 2026 closing date and that the Burnaby hybrid arrangement works for you.
- Submit your application on BC Hydro’s own page. BC Hydro handles its own hiring, so your application goes to BC Hydro, not to this site.
Apply through the employer’s official careers page: BC Hydro careers page — Engineering, Transmission Planning, Burnaby
Apply only through the employer’s official page linked above. JobsInCanadaDaily never charges for job applications. If anyone asks you for a fee to apply, it is a scam.
Frequently Asked Questions
What is the pay?
The posting states $109,700 to $138,700 a year for a permanent full-time role at 37.5 hours a week.
How many openings are there?
Two. Both are permanent full-time openings on the Transmission Planning team.
When do applications close?
On 17 December 2026, according to the posting as opened on 28 November 2026. Check the live posting for any change, as the posting is described as evergreen.
Where is the job, and is it hybrid?
At Edmonds A03 in Burnaby, British Columbia, on a hybrid schedule.
How do I apply?
Through BC Hydro’s own careers page, linked above. Applications go to BC Hydro, not to this site, and no fee is charged.
Related reading
- Canadian Resume Format with Examples
- No Canadian Experience? How to Get Hired
- Job Scams in Canada: Warning Signs
How We Publish Jobs: this role was listed from BC Hydro’s own careers page. JobsInCanadaDaily takes no applications and charges no fee. The pay, dates and duties above come from the posting itself.
You apply on the employer’s own careers page, not on this site.
How We Publish Jobs
Every listing here starts from the employer’s own announcement — we do not invent roles, salaries or closing dates. We check each posting before it goes live and show the employer’s original date where we know it. Listings can close or change, so always confirm the latest status on the original posting before you apply. Spotted something wrong or expired? Tell us here and we will check it.






Leave a Reply
You must be logged in to post a comment.